{"id": "mcp-server-npm-theluckystrike-mcp-change-order-e7f3f8", "kind": "listing", "fingerprint": "f959a0520139390927627da533316fec9f46ade772064f56ce5ad5086bef0ca6", "algorithm": "sha256 over canonical JSON (sorted keys, no spaces) of the public metadata listed in 'covers'", "covers": "public registry listing: name, version, description, packages, remotes, repository link", "status": "sealed", "first_sealed": "2026-11-26T04:14:48Z", "last_verified": "2026-11-26T04:14:48Z", "checks": 1, "check_tier": "daily", "changed": null, "history": [{"ts": "2026-11-26T04:14:48Z", "event": "first", "fp": "f959a0520139390927627da533316fec9f46ade772064f56ce5ad5086bef0ca6", "prev_fp": null, "seq": 232700, "window_from": null, "window_to": null, "diff": null}], "chain": {"seq": 232700, "record_hash": "0375134e59c0be501e951a1066e015339c8c0575941c90f336e0edc480d9deb0", "record_time": "2026-11-26T22:39:40Z", "record_url": "https://toolpulse.avanciq.com/api/chain/232700.json", "daily_root": "not yet in a daily root (next root at the daily run)"}, "verify": {"signed_text": "toolpulse-seal-v1|mcp-server-npm-theluckystrike-mcp-change-order-e7f3f8|f959a0520139390927627da533316fec9f46ade772064f56ce5ad5086bef0ca6|sealed|2026-11-26T04:14:48Z|232700", "signature": "UxzZMVbvAErIxwk2wtn2SAAT8yfDfwFEbqsvtxfGeDEuPgEs9xtNlExyTx5ny4S2ucFQH0N81jZBdtFKDVOpDg==", "public_key": "iud8+o5U5i/PNtQ/jBVo1oKB9k/assKu5rj/l1pDU5Q=", "key_url": "https://toolpulse.avanciq.com/key.txt", "how": "1) Ed25519-verify signed_text with signature and public_key. 2) Check that id, fingerprint, status, last_verified and chain.seq in this document equal the fields inside signed_text. 3) Fetch chain.record_url and check sha256(payload) and the record hash chain as described at /verify/. 4) Recompute the fingerprint from the public metadata yourself if you want to."}, "badge": "https://toolpulse.avanciq.com/seal/mcp-server-npm-theluckystrike-mcp-change-order-e7f3f8.svg", "page": "https://toolpulse.avanciq.com/i/mcp-server-npm-theluckystrike-mcp-change-order-e7f3f8/", "limits": "The seal covers only the PUBLIC metadata named in 'covers'. It shows that this published tool changed and when; it cannot see private or self-hosted copies, cannot prove that any data was taken or misused, and never judges why something changed.", "engine": "tp-seal-1.0", "generated": "2026-11-27T16:36:16Z"}