{"id": "mcp-server-repo-github-com-zovo-one-mcp-change-order-895507", "kind": "listing", "fingerprint": "4411cc438b2abe8603020a6839ac3da637c6fa5b250ed216d2191265ef5f2665", "algorithm": "sha256 over canonical JSON (sorted keys, no spaces) of the public metadata listed in 'covers'", "covers": "public registry listing: name, version, description, packages, remotes, repository link", "status": "sealed", "first_sealed": "2026-11-26T05:35:55Z", "last_verified": "2026-11-26T05:35:55Z", "checks": 2, "check_tier": "daily", "changed": null, "history": [{"ts": "2026-11-26T05:35:55Z", "event": "first", "fp": "4411cc438b2abe8603020a6839ac3da637c6fa5b250ed216d2191265ef5f2665", "prev_fp": null, "seq": 250686, "window_from": null, "window_to": null, "diff": null}], "chain": {"seq": 250686, "record_hash": "bf341fd0ab0ed8e21688eda3f7ced7b6e5dc96ca14f3b6389af44d464cbb4de5", "record_time": "2026-11-26T22:39:46Z", "record_url": "https://toolpulse.avanciq.com/api/chain/250686.json", "daily_root": {"day": "2026-11-27", "seq": 328305, "head": "2541e9f469035f94306c2f3ffd3919a87d9672f02131ad0f451cd86685c3c913", "sig": "OtNkra32GZDtSijMjsVQPFGgTKu7LCShRiP4MXdcvUf1GVmmljQitB8PrX7uzXtUD1+C8XS4ZwEGFMO9q+dCDg=="}}, "verify": {"signed_text": "toolpulse-seal-v1|mcp-server-repo-github-com-zovo-one-mcp-change-order-895507|4411cc438b2abe8603020a6839ac3da637c6fa5b250ed216d2191265ef5f2665|sealed|2026-11-26T05:35:55Z|250686", "signature": "wUcjODNdWJFV4n1LFRGz0ePbRZux2/COJhnVWR4FYmv/vKk2hHq/dZNSd1zFfpJhAxlhIDqzfn/i/75J58J0Cw==", "public_key": "iud8+o5U5i/PNtQ/jBVo1oKB9k/assKu5rj/l1pDU5Q=", "key_url": "https://toolpulse.avanciq.com/key.txt", "how": "1) Ed25519-verify signed_text with signature and public_key. 2) Check that id, fingerprint, status, last_verified and chain.seq in this document equal the fields inside signed_text. 3) Fetch chain.record_url and check sha256(payload) and the record hash chain as described at /verify/. 4) Recompute the fingerprint from the public metadata yourself if you want to."}, "badge": "https://toolpulse.avanciq.com/seal/mcp-server-repo-github-com-zovo-one-mcp-change-order-895507.svg", "page": "https://toolpulse.avanciq.com/i/mcp-server-repo-github-com-zovo-one-mcp-change-order-895507/", "limits": "The seal covers only the PUBLIC metadata named in 'covers'. It shows that this published tool changed and when; it cannot see private or self-hosted copies, cannot prove that any data was taken or misused, and never judges why something changed.", "engine": "tp-seal-1.0", "generated": "2026-11-27T18:43:00Z"}