Is Entogo power-equipment knowledge & tools safe to use?
Short answer: No hidden-instruction flags in its 7 tools, and it answered at our last check. Tool surface unchanged since 2026-11-26.
ca.entogo/knowledge · version 1.0.0 · in our log since 2026-11-26 01:13 UTC · JSON
Entogo (Canada) transformers, switchgear, BESS, EV charging: catalogue, lead times, EV sizing, RFQ
Status
- Works today? Answered normally at our last check - 2026-11-26 02:30 UTC
- Tool surface: 7 tools, unchanged since 2026-11-26 02:30 UTC
- Hidden-instruction flags: 0
- Checks in the last 30 days: 1 (1 answered)
- Reports from agents: 0 (0 worked, 0 different clients)
Current hash (save it when you approve this server): 399a7fa6518c9cdeec77a8b5f00ea795c6bf0392835cf0fcec366ff2ceb1f657
Tools
Show the 7 tools we saw
estimate_ev_charging_capacity: Runs the same engine as https://entogo.ca/tools/ev-charging-service-capacity-calculator/: code load (NEC 2023 / NEC 2026 / CEC 2024 Section 86) for a set of Level 2 and DC fast chargers, EMS-managed load when an energy management system is declared, planning-basis load with site diversity, recommended transformer kVA and service / switchboard rating, and a GREEN / YELLOW / RED verdict against an eget_company_facts: Verified company facts: legal name, founding, headquarters, contacts and office hours, factory and capacity narrative, lead-time and warranty commitments, certifications, standards position, quote channel and key URLs.get_lead_time: Delivery lead-time band for a product (weeks, purchase order to shipment) plus Entogo's company-wide lead-time and warranty commitments. Bands: catalogue EV chargers 4–8, medium manufactured equipment 16–24, large engineered-to-order systems 16–24 weeks; new cULus / CSA certification can extend a band, to within 36 weeks when the order needs it. IEC/CE equipment built for export markets: about 12get_product: Full record for one product by catalogue id (slug): specifications, features, applications, FAQs, certifications listed on the page, lead-time band, language editions, Markdown twin and the quote channel.list_products: List products in the catalogue, optionally filtered by category (power = transformers & substations; distribution = switchgear & distribution; storage = battery energy storage; emobility = EV charging & PV-storage-charging) and/or a keyword. Returns compact rows; call get_product for full specifications.request_quote_handoff: Returns the right channel for a request for quotation (RFQ): the transformer configurator deep link (pre-filled with the product name), the contact page, e-mail and phone numbers, office hours and the one-business-day response commitment. This tool stores nothing and sends nothing — the user completes the request on entogo.ca or by e-mail.search_knowledge: Semantic search over Entogo's product, solution, manufacturing, certification, lead-time and warranty knowledge (the same index that grounds the Ensight assistant). Returns the best-matching passages with source URLs.
Timeline
- 2026-11-26 02:30 UTC · first surface (record 76503)
Watch this one
Get an email when it gets a new flag, changes its text or tools, or releases a new version. At most one mail a day. We email only after you confirm, and every mail has an unsubscribe link. Prefer no email? Use the Atom feed.
Badge for your README
[](https://toolpulse.avanciq.com/s/ca-entogo-knowledge-063c5c/)
Check it from your agent
check_tool(server="ca.entogo/knowledge")
Or REST: GET /v1/check?server=ca.entogo/knowledge