Is Ardenvale Construction Tools safe to use?
Short answer: No hidden-instruction flags in its 10 tools, and it answered at our last check. Tool surface unchanged since 2026-11-26.
com.ardenvaleconstruction/tools · version 1.0.0 · in our log since 2026-11-26 01:15 UTC · JSON
Planning tools for commercial and industrial construction.
Status
- Works today? Answered normally at our last check - 2026-11-26 02:56 UTC
- Tool surface: 10 tools, unchanged since 2026-11-26 02:56 UTC
- Hidden-instruction flags: 0
- Checks in the last 30 days: 1 (1 answered)
- Reports from agents: 0 (0 worked, 0 different clients)
Current hash (save it when you approve this server): b7faddc8a11e2c3d2260ca352520e7c0d2de0ce4f7a7631ae1d487b012f9c4d1
Tools
Show the 10 tools we saw
accessible_washroom_clearance_checker: Pass or fail check of barrier-free stall, ambulatory stall or universal washroom clear dimensions against Ontario Building Code Articles 3.8.3.8 and 3.8.3.12. Preliminary clearance check only. The architect, the accessibility consultant and the building official govern. This does not certify a washroom.change_of_use_document_checklist: Printable Toronto building permit document checklist for a commercial change of use or interior alteration, from the City of Toronto Building guide. Organizes forms and drawings only. Document organizer only. It is not a permit determination or a fee estimate. The City of Toronto examiner and your designer decide what the application needs.child_care_space_checker: Check indoor play space, outdoor play space and sleeping area per child for an Ontario licensed child care centre. Preliminary planning check only. Licensing is decided by the ministry. The architect, the engineer and the permit set govern the design.exit_width_and_egress_door_calculator: Required exit width, number of exits, door count and travel distance limit for an occupant load under Ontario Building Code Subsections 3.4.2 and 3.4.3. Preliminary planning figure only. The architect, the fire protection engineer and the permit set govern the means of egress.occupant_load_calculator: Minimum design occupant load for a floor area from Ontario Building Code Table 3.1.17.1 area per person values. Preliminary planning figure only. The architect, the engineer and the permit set govern the occupant load used for design and approval.office_space_calculator: Estimate usable and rentable office square feet from headcount, growth, desk sharing, rooms, circulation and load factor. Preliminary planning estimate only. The architect's test fit, the building drawings and the permit set govern the actual layout.parking_stall_count_for_change_of_use: Indicative parking stall count for a change of use in Toronto, Mississauga or Brampton from the zoning by-law rates, with the by-law named. Confirm with the municipality. Indicative only. Parking requirements differ by municipality, zone and site-specific exceptions. Confirm with the municipality's zoning examiner.restaurant_seating_and_washroom_requirement: Occupant load, seat capacity and minimum patron and employee water closets and lavatories for an Ontario restaurant or bar (Building Code Table 3.7.4.3.-D, -E and -F). Preliminary planning figure only. The architect, the public health unit, the building official and the permit set govern the seat count and the fixture count.retail_store_layout_and_aisle_width_calculator: Occupant load, exits, aisle widths and accessible route for an Ontario retail store, with a fixture run estimate from shelving depth. Preliminary planning figure only. The architect, the fire protection engineer and the permit set govern the layout and the means of egress.washroom_fixture_calculator: Minimum water closets and lavatories for each sex in an Ontario office or retail space (Building Code Tables 3.7.4.7 and 3.7.4.8). Preliminary planning figure only. Accessible and universal washroom rules apply separately. The architect, the engineer and the permit set govern.
Timeline
- 2026-11-26 02:56 UTC · first surface (record 77670)
Watch this one
Get an email when it gets a new flag, changes its text or tools, or releases a new version. At most one mail a day. We email only after you confirm, and every mail has an unsubscribe link. Prefer no email? Use the Atom feed.
Badge for your README
[](https://toolpulse.avanciq.com/s/com-ardenvaleconstruction-tools-b19c53/)
Check it from your agent
check_tool(server="com.ardenvaleconstruction/tools")
Or REST: GET /v1/check?server=com.ardenvaleconstruction/tools